A 1000 MW / 500 kV high voltage alternative current (AC) electricity link connecting the Libyan and Egyptian electricity grids from Tobruk (North East Libya) to Sallum (North West Egypt). The project includes the construction of substations on both sides of Libya/Egypt border and the installation of overhead lines between the substations. The Libya-Egypt Interconnector will be 150 km long.